Supply Simulation, Process Optimization, Lean Design
 
 S e r v i c e s

 

 

 

 

Demand Pull Simulation of Heuristic Production Schedules with Supply and Demand Inputs

 
Demand Pull simulation models evaluate schedules for both make-to-stock and make-to-order strategies.  The OpStat lean manufacturing design process includes development of heuristic algorithms first for production schedules, followed by simulation to test them before implementation.  

 

 


Info@OpStat.com

Copyright 2005 OpStat Group Inc. All rights reserved.  Last modified: 7/1/05